HIVE 13 // SOP // HV-SOP-0008
ALL SYSTEMS NOMINAL ·
SOP · ENGINEERING

Drone Swarm Pre-Flight & Tasking

ActiveEngineeringRev C
Doc Control HV-SOP-0008 Revision C Effective 2091-05-30 Next Review 2092-05-30 Owner Aerial Operations Engineer Approver Director of Operations Status Active Classification INTERNAL // QUANTUM-ZONE-TASK-FORCE EYES-ONLY

Purpose

To govern pre-flight checks, airspace clearance, and mission tasking of the HIVE-13 surveillance and interdiction drone swarm used for hornet-nest reconnaissance and apiary monitoring. The procedure ensures airworthiness, deconfliction, and traceable tasking before any launch.

Scope

All swarm drone pre-flight, tasking, and launch authorisation.

In scope:

Out of scope:

Definitions

Swarm
The coordinated group of autonomous drones operating under a single tasking plan.
Geofence
The bounded airspace volume loaded into each airframe to constrain flight.
Tasking Plan
The authorised set of waypoints, payload actions, and abort conditions for a mission.

Responsibilities

Aerial Operations Engineer (Owner)
Owns the procedure and grants launch authorisation against an approved tasking plan.
Drone Technician
Performs pre-flight inspection, payload fit, and link checks on each airframe.
Mission Controller
Loads geofences, monitors the swarm in flight, and commands abort if needed.

Procedure

Pre-Flight

  1. Inspect each airframe for damage, prop integrity, and secure payload.
  2. Verify battery state, return-to-home setpoint, and control link.
  3. Confirm firmware and tasking-plan versions match the manifest.

Airspace & Tasking

  1. Check weather and deconflict airspace against other operations.
  2. Load the geofence and approved tasking plan into each airframe.
  3. Verify abort and loss-of-link behaviour before authorising launch.

Launch & Monitor

  1. Authorise launch only with full pre-flight and airspace sign-off.
  2. Monitor swarm telemetry and geofence adherence throughout the mission.
  3. Recover airframes, log flight hours, and report any anomaly.

PPE & Controls

Eye protection during launch and recoveryHigh-visibility vestHearing protection near rotors

Records Generated

References

Revision History

RevDateNote
B2091-04-10Added loss-of-link behaviour verification before launch.
C2091-05-30Required firmware and tasking-plan version match against manifest.
← Back to SOP Library