HIVE 13 // SOP // HV-SOP-0012
ALL SYSTEMS NOMINAL ·
SOP · REWILDING

Rewilding Release Readiness

Under ReviewRewildingRev B
Doc Control HV-SOP-0012 Revision B Effective 2091-06-25 Next Review 2092-06-25 Owner Rewilding Program Lead Approver Director of Operations Status Under Review Classification INTERNAL // QUANTUM-ZONE-TASK-FORCE EYES-ONLY

Purpose

To govern the assessment of colonies and sites for release of pollinator stock back into managed wild landscapes. The procedure ensures only health-cleared, genetically appropriate stock is released into suitable, consented sites with a monitoring plan in place.

Scope

All readiness assessment and authorisation for rewilding releases.

In scope:

Out of scope:

Definitions

Release Readiness
The state in which stock, site, and monitoring all meet thresholds for an authorised release.
Genetic Suitability
Confirmation that release stock matches the target landscape's reference population.
Consent Confirmation
Documented landholder and regulatory permission for release at a specific site.

Responsibilities

Rewilding Program Lead (Owner)
Owns the procedure and signs the release-readiness authorisation.
Field Ecologist
Assesses release sites, forage, and consent and establishes monitoring.
Apiary Health Officer
Confirms release stock is health-cleared and genetically suitable.

Procedure

Stock Verification

  1. Confirm colonies are quarantine-cleared with current clean screens.
  2. Verify genetic suitability against the target landscape reference.
  3. Confirm colony strength and queen status meet release thresholds.

Site Readiness

  1. Assess forage, water, and predation risk at the candidate site.
  2. Confirm landholder and regulatory consent is documented.
  3. Establish the post-release monitoring plan and responsible observer.

Release & Authorisation

  1. Obtain the signed release-readiness authorisation from the program lead.
  2. Execute the release and perform immediate post-release welfare checks.
  3. Record release coordinates, stock identity, and initiate monitoring.

PPE & Controls

Bee suit and veil for handlingField navigation and recording kit

Records Generated

References

Revision History

RevDateNote
A2091-04-30Initial release of rewilding readiness procedure.
B2091-06-25Added genetic-suitability verification and consent file requirement.
← Back to SOP Library