HIVE 13 // SOP // HV-SOP-0003
ALL SYSTEMS NOMINAL ·
SOP · CONTAINMENT

HCL-4 Hornet Vault Access & Containment

ActiveContainmentRev E
Doc Control HV-SOP-0003 Revision E Effective 2091-04-01 Next Review 2092-04-01 Owner Containment Lead Approver Director of Operations Status Active Classification INTERNAL // QUANTUM-ZONE-TASK-FORCE EYES-ONLY

Purpose

To govern all access to and containment of HCL-4 classified predatory hornet stock under a strict two-person rule and Director-level authorisation. The procedure exists to prevent any escape, sting exposure, or unauthorised handling of the highest-consequence specimens held by HIVE-13.

Scope

All entry, handling, and egress involving the HCL-4 hornet vault and its specimens.

In scope:

Out of scope:

Definitions

HCL-4
The highest HIVE Containment Level, reserved for predatory hornet stock capable of mass apiary loss or lethal envenomation.
Two-Person Rule
The requirement that no individual is ever alone within the vault envelope; entry and every critical action need two authorised operators.
Vestibule
The sealed airlock antechamber separating the vault interior from the clean corridor, never opened on both faces at once.
Breach State
Any confirmed or suspected loss of containment integrity triggering immediate facility lockdown.

Responsibilities

Containment Lead (Owner)
Owns the procedure, maintains the authorised-operator roster, and reviews every access record.
Director of Operations
Grants per-session entry authorisation and is the sole authority to clear a breach state.
Containment Operator (Primary and Secondary)
Execute entry, handling, and egress in matched pairs, each independently confirming seal integrity.

Procedure

Authorisation

  1. Confirm both operators appear on the current authorised roster.
  2. Obtain Director of Operations session authorisation against a stated task.
  3. Verify no concurrent breach state and that the standby responder is posted.

Entry & Handling

  1. Both operators don sealed Level-4 suits and cross-check each other's integrity.
  2. Cycle the vestibule with only one face open at any moment.
  3. Perform the authorised task; no action proceeds without verbal two-person confirmation.
  4. Maintain continuous specimen count against the vault manifest.

Egress & Breach Response

  1. Reconcile specimen count to the manifest before initiating egress.
  2. Cycle the vestibule, decontaminate suits, and confirm both seals closed.
  3. On any anomaly, declare a breach state, trigger lockdown, and notify the Director immediately.
  4. Record the dual-signed access log and any deviation before standing down.

PPE & Controls

Sealed Level-4 sting-resistant suit with positive-pressure hoodDouble-gauntlet puncture-resistant glovesIndependent radio and tethered escape lineAdrenaline auto-injector carried by the standby responder

Records Generated

References

Revision History

RevDateNote
D2091-02-15Added standby responder posting and auto-injector requirement.
E2091-04-01Made Director the sole authority to clear a breach state.
← Back to SOP Library